Franklin Avenue Baptist Church
Project Information: Franklin Avenue Baptist Church is a 120,000 sq ft facility located in New Orleans LA.The three story building will seat 4500 and provides the congregation with large children, preschool, and youth wings complete with worship areas. This facility has a proposed project budget of $26,000,000. The project involves the planning, design, and construction of the facility. The scope of this project includes the main sanctuary, two worship areas, a large kitchen and fellowship area, a conference center, classroom wings, an office wing, and a large gallery. The project is...
Read More3rd & 4th Battalions HALO/SCUBA/TEMF
High Altitude Low Opening (HALO) Building Addition This project involved the Electrical design for a 5100sf addition to the existing HALO building to support U.S. Army Special Ops. The addition accommodates a new large parachute packing area, oxygen fill area, storage office, and restrooms. The facility has been designed for a LEED Silver rating. The facility utilizes energy efficient fluorescent fixtures that are controlled through occupancy sensors. This facility also has secure and non-secure communications, fire alarm, security system, and lightning protection. SCUBA Building...
Read MoreViam International
This project was a fast paced design/build construction effort for an 82,000 sq. ft. manufacturing warehouse and a two story, 22,000 sq. ft. corporate headquarters for VIAM America. VIAM America is one of the world’s largest suppliers of floormats for the automobile industry. The manufacturing warehouse heating, ventilating, and air conditioning (HVAC) is provided by four, groud mounted, 75 ton Intellipak air conditioning units with economizers to take advantage of free cooling during winter months die to the high internal heat load produced by the manufacturing equipment. The corporate...
Read MoreAscend Federal Credit Union Headquarters
This project involves the planning, design, and construction of a new, 77,000 sf, Class “A” headquarters building for Ascend Federal Credit Union. This building is located on a 16 acre site and is a focal point building in the city of Tullahoma, TN. Ascend Federal Credit Union represents over $1.5 billion in assets serving 135,000 members from 17 locations. Project cost $18,000,00.00. This state of the art building has a 1600 amp, 480 volt electrical service. This facility will be equipped with a 1250kW generator that will be able to power the entire facility during power outages as well...
Read More


Connect With Us